All TOPSTAR scaffolding board design with non-slip surface and sufficient drainage.
It has a high capacity and good lifespan and Q235 steel is used as the principal production material.There are hot dip galvanized and pre-galvanized surfaces treatment,providing an excellent weather resistance and preventing the steel board from corrosion with acceptable durability.
TOPSTAR scaffold metal boards are compliant with BS1139, EN12811 and the most recent safety requirements of scaffolding. All TOPTSTAR boards offer a safe and long-lasting durable solution to suit any access requirements.
Property of Scaffolding Board with Hook |
|
Surface: |
Pre-galvanized;Hop Dip Galvanized;Black |
Material: |
Q195-Q235 |
Standard: |
BS EN 12811-1;EN1004:2004 |
Certificate |
ISO,SGS,BV TUV |
Available Size |
||||
Types |
Width |
Height |
Thickness |
Length |
240 |
240mm |
45mm |
1.0mm-2.0mm |
1-3m |
250 |
250mm |
50mm |
||
420 |
420mm |
45mm |
||
450 |
450mm |
45mm |
||
480 |
480mm |
45mm |
||
500 |
500mm |
50mm |
1.Concave and convex holes on the surface with flanging, good anti-skid effect
2. Trapezoid stiffeners and box type stiffeners are installed in the middle to increase compressive strength and meet different customers requirements.
3. The molding is standardized and the hole spacing is clean, giving the product a lovely and long-lasting appearance.
4. The bottom of the distinctive sand leaking holes has anti-sand accumulation points, and the surface groove has non-slip holes.
5. Galvanized surface, fire proof and anti-slide;
6. Effective service life reaches 5 years, low investment but high returns;
Material Rolled --- Punching--Bending ---Cutting-----Welding
Construction, Petrochemical, Marine, Oil & Gas, Insulation
In Vietnam, the Philippines, Singapore, Malaysia, the United Arab Emirates, and other nations, Topstar Scaffolding has participated in scaffolding project cases.
Vietnam :Long Son Petrochemicals Complex Porject ,
Steel Planks:250*50*1.2 with length from 1m to 4m 150 tons.
Hot Dip Galvanized pipes:48.3*3.2*6000mm 100 tons
BS1139 couplers 50 tons.
Vietnam: Goverment Ringlock Project
Scaffolding Ringlock :300 tons Standard 48.3*3.0mm with 100 tons Ledger 42*2.5mm
Singapore: Afton Chemicals Expansion Project
Scaffolding planks 240*45*1.2mm with length from 1m to 3m:100 tons
Hot Dip Galvanized steel pipe 48.6*2.4*6000mm 200 tons;
JIS Couplers:100 tons
United Arab Emirates :Gulf Arena Construction Projects
Steel Board 225*38*1.5mm with length 1m ,2m and 3m total 200 tons.
Base Jack and Uhead 38*600mm 100 tons
FAQ
Q1.How we manufacture the planks?
Q2. How many production lines of steel plank do you have?
8 fully automatic steel board processing production lines in size 210×45mm、225×38mm、240×45mm、250× 50mm and 300 *50mm;
Q3.How to guarantee quality ?
We have quality inspection department to check size,weight,surfaces and test planks maximum load,concentrated load before delivery.We allow any third party to inspect goods.
http://www.tsscaffold.com/